Temporary Electricity Connection

Arranging a temporary BESCOM connection for construction sites, events and short-term needs.

Electricity Connection and TransferTemporary electricity connection

What is this service?

SRCHN.PROPERTY prepares the temporary connection application with the site ownership or permission documents and load requirement, files it with BESCOM, and follows through sanction and meter installation.

Construction sites, events and exhibitions take a temporary BESCOM connection with a defined load and period, against a deposit, instead of a permanent connection. The application needs the site documents and the expected load; the connection is sanctioned for a limited period and disconnected when it lapses.

Why and when you need it

Why
Construction power is a legal requirement - running a site off a neighbour's meter or a generator alone invites disconnection and penalties. Events similarly need sanctioned temporary load.
Who needs it
Builders and contractors starting construction, and organisers of events and exhibitions.
When
Before site work or the event begins.

Required documents

  • Site ownership documents or owner's permission
  • Applicant ID and address proof
  • Expected load details
  • Site plan (for construction)
  • Event permission (for events)

Identity and supporting documents

  • PAN card of each applicant or party
  • Aadhaar card or another government photo identity and address proof
  • Passport-size photographs
  • For companies and associations: incorporation documents, board resolution and authorisation letter

Step-by-step procedure

  1. Prepare the application with site documents and load requirement
  2. File with the jurisdictional BESCOM office
  3. Pay the required deposit and charges
  4. Follow through inspection and meter installation
  5. Arrange disconnection or extension before the sanctioned period lapses

Fees, stamp duty and timelines

Government fee
Government fees, where applicable, are paid only on the official portal or at the government office. Confirm the current amount on the official portal before payment.
Assistance charges
Professional assistance charges are quoted after understanding your requirement. Government fees and SRCHN service charges are always shown separately. Confirm the final quote before work begins.
Processing time
Processing time varies by office and case. No completion timeline is guaranteed.
Government fees and SRCHN assistance charges are always kept separate. Nothing here is an invented price - confirm current amounts on the official portal or with our team before paying.
Common rejection reasons
  • Documents not matching government records
  • Outstanding dues or arrears on the property
  • Incomplete application or missing supporting documents
  • Identity or ownership proof not matching the register
  • Application filed in the wrong jurisdiction or office
Important cautions
Government portals and procedures change - confirm current requirements on the official portal
Keep originals safe; submit copies unless originals are specifically demanded
Timelines vary by office and case load - no completion date is guaranteed

Related services

UTILITY TRANSFERS

New BESCOM Electricity Connection

New domestic or commercial electricity connections with BESCOM - application, documents, inspection and meter

UTILITY TRANSFERS

BESCOM Load Enhancement

Increasing the sanctioned electricity load of an existing BESCOM connection.

Ready when you are

Book temporary electricity connection online, or call +91 77100 52202.